Skip to main content

Arnhem

Accsys Technologies

Accsys Technologies

Built Year

2017

Contractor

Bruil Bouw bv

Developer

Accsys Technologies

Aesthetic curtain walls

Accsys Technologies new production location in Arnhem with ultra high performance concrete curtain walls installed on the building. The installation of the 14 elements was completed in September. 

Hi-Con NL and Bruil Prefab has supplied the project with 14 curtain wall elements in nine variations and with a total area of 165 m2 in CRC i2®. The elements measure 3200 mm in height.   

Don't be shy

Do you need more information?
Let's get in touch

Contact