Arnhem
Accsys Technologies
Built Year
2017
Contractor
Bruil Bouw bv
Developer
Accsys Technologies
Aesthetic curtain walls
Accsys Technologies new production location in Arnhem with ultra high performance concrete curtain walls installed on the building. The installation of the 14 elements was completed in September.
Hi-Con NL and Bruil Prefab has supplied the project with 14 curtain wall elements in nine variations and with a total area of 165 m2 in CRC i2®. The elements measure 3200 mm in height.
Don't be shy